On the upgrading system side, running a membrane upgrading system, you would need to check different things on a daily basis, monthly basis and on a preset x,xxx hour basis. In short :<div>
Preset hours: Based on manufacturer instructions / Maintenance
Pre-injection
Gas flow indicators
Gas quality indicators
The daily checking of a membrane biogas upgrading system does not take more than 1 hour and can be done by following a checklist. For systems like DMT’s, there is 24/7 monitoring services. If you have a farm or a facility with no ‘specialized personnel’, a membrane system is an ‘easy’ system to operate.
Send a message if you need to discuss further.
</div>
Report
There was a problem reporting this post.
Block Member?
Please confirm you want to block this member.
You will no longer be able to:
See blocked member's posts
Mention this member in posts
Invite this member to groups
Message this member
Add this member as a connection
Please note:
This action will also remove this member from your connections and send a report to the site admin.
Please allow a few minutes for this process to complete.